Assignment Name:
Environmental Impact Assessment of Oil Pipeline from Single Point Mooring to Bosicor Oil Refinery
Country:

Pakistan

Location within Country:

Hub, Baluchistan

Name of Client:

Bosicor Pakistan Limited (Refinery)

Completion Date:

Jul 2008

Name of Associated Consultants, if any:

None

Narrative Description of Project:

BPL has planned to acquire oil from international market and thus establishing a pipeline in association with Coastal Refinery Ltd. This pipeline will partly be laid down under water and partly on land. The concept of this project is establish a Single Point Moor (SPM) in the sea at Khalifa Point from where it will be connected to the pipeline and then pipeline will be connected to the storage tanks of BPL.

An EIA study has extensively considered all the relevant clauses and sections of national legislations, regulations and guidelines related to the oil refinery as well as appropriate international guidelines. The recommendations were given on the basis of project activities.

Description of Actual Services Provided by Our Staff within the Assignment:

  • To assess the existing/baseline environmental and socioeconomic conditions at and around the project site.
  • Identify any environmental and social sensitivity areas.
  • Conduct ambient air quality monitoring.
  • Identify the likely impacts of the proposed project on the natural and socioeconomic environment.
  • Conduct a socio-economic survey of the area.
  • Propose appropriate mitigation and monitoring measures that can be incorporated into the design of the proposed activities to minimize any damaging effects or lasting negative consequences.
  • Prepare an Environmental Management Plan (EMP) identifying the procedure for the implementation of mitigation measures, monitoring of environmental conditions, and management of solid wastes.