Construction of OP-II at Karachi Port was commenced in the year 2003 to replace the 37 years old pier structure. The pier is designed to handle 75,000 DWT Oil tankers.
Description of Actual Services Provided by Our Staff within the Assignment:
M/s. China Harbour Engineering Co. was awarded the construction contract for Oil Pier-II. M/s. China Harbour appointed Exponent Engineers to provide design support during the execution of Oil Pier-II. The services provided by Exponent Engineers include:
Development of revised drawings and design as per the requirements of the project
Development of Concrete Mix Design