Assignment Name:
Resettlement Action Plan for Rakhi Gajj – Bewata 33.84 Km Section of N-70 National Highway
Country:

Pakistan

Location within Country:

District Dera Ghazi Khan, Punjab

Name of Client:

  • National Highway Authority (NHA)
  • CTI Engineering International Co. Ltd. Japan
  • Completion Date:

    Dec 2011

    Name of Associated Consultants, if any:

    None

    Narrative Description of Project:

    The road section between Rakhi Gajj and Bewata (approximately 33 km long), an abrupt mountainous section of N 70, has been restricting safe and smooth traffic flow mainly due to hazardous condition in terms of rocks and debris falling or sliding from the coarse weathered mountain slopes. In such undulating section, traffic including heavily loaded trucks and buses had to tackle with narrow road width. As part of the development program, NHA, with the assistance of CTI Engineering International Co. Ltd (CTII), Japan planned for strengthening and widening of this Section focusing on the improvement of the mountain route section to eliminate traffic bottlenecks to assure traffic safety and smooth traffic flow. The improvement of this section is very important to facilitate mobility of both people and goods between the provinces of Balochistan and Punjab on N 70 highway. Since the widening and alignment changes required land acquisition, therefore, NHA prepared a Resettlement Action Plan (RAP) in compliance with the legal requirements of Government of Pakistan.

    Description of Actual Services Provided by Our Staff within the Assignment:

    • Develop an entitlement matrix for the Project Affected Persons (PAPs).
    • Assess the type and magnitude of land acquisition and resettlement.
    • Identify and enumerate Project Affected Persons (PAPs) and document the affected assets and infrastructure.
    • Define institutional and implementation arrangements for the Resettlement Action Plan (RAP).
    • Define the monitoring and evaluation requirements for the RAP.
    • Provide cost estimates for the implementation of the Resettlement Action Plan in accordance with the Land Acquisition Act and Donors Guidelines to ensure fair, timely, and transparent compensation for the identified Project Affected Persons.

    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.

    Start typing and press Enter to search