Traffic Impact Assessment Report for Mushaireb Project
Assignment Name:
Traffic Impact Assessment Report for Mushaireb Project
Country:
Sudan
Location within Country:
Khartoum
Name of Client:
QATARI DIAR Real Estate Investment Company
Completion Date:
Sept 2010
Name of Associated Consultants, if any:
None
Narrative Description of Project:
Primary Disciplines:
Traffic Analysis, Planning & Design
Assessment of Utilizing Mass Transit
Transportation Planning & Preliminary Design
Transportation Structures Preliminary Planning
The project area lies in Bahri county on Northern bank of Blue Nile, close to its confluence with White Nile and facing Presidential Palace in Central Khartoum. It is bounded by paved main Access road on the North, a minor access road on the west and by Al-Mak-Nimr Bridge on its East and River Nile in South. The areas to the East and west of the site are occupied by low and residential establishments. The area is 3 Km i.e. 15 minute drive from Airport.
There are many major land use development projects planned in this portion. The project also had significant population in future, however its impact was needed modeled. The project location lies within the built-up areas of Khartoum therefore its impacts on the city would also have significant.
Description of Actual Services Provided by Our Staff within the Assignment:
The services of Exponent Engineers have been hired for the following tasks:
Review of Available Plans, Studies & Existing Conditions
Analysis of Future Situations
Parking Requirements
Trip Generation / Attraction
Trip Distribution Estimation
Determination of Traffic Volume on each Roads (Traffic Assignment)
Operational Analysis
Access & Egress Analysis for Critical Area
Contact Us
We're not around right now. But you can send us an email and we'll get back to you, asap.