Prefeasibility Study of BRT “Brown” &”Yellow” lines with Implementation Program and Organizational Structure
Assignment Name:
Prefeasibility Study of BRT “Brown” &”Yellow” lines with Implementation Program and Organizational Structure
Country:
Pakistan
Location within Country:
Karachi
Name of Client:
Karachi Mass Transit Cell (KMTC), Government Of Sindh
Completion Date:
January 2013
Name of Associated Consultants, if any:
None
Narrative Description of Project:
Primary Disciplines:
Mass Transit, BRT/MRT Planning & Preliminary Design
Mass Transit, Transportation Planning
ITS System Planning & Design
Mass Transit, BRT/MRT Operational Planning
Mass Transit, Fleet Size Determination & BRT Bus Selection
This study includes BRT transportation and traffic planning and preliminary stage design and estimation of geometrics, traffic management, ridership assessment, ITS & fare collection system, stations planning, operational and fleet management plans etc. This study provided a quick guide for the investors to invest on the two BRT lines ‘Brown’ & ‘Yellow’. These corridors are on the highest priority list of Karachi Mass Transit Cell (KMTC) to be implemented in Karachi in order to initiate mass transit system. This report will also guide in the feasibility stage of the project and for the detailed design of the alignment. BRT Blue Line is the longest BRT Line in Pakistan (54 km); BRT Yellow Line is 26.5-kilometre-long.
Description of Actual Services Provided by Our Staff within the Assignment:
Exponent Engineer has provided complete Traffic, Preliminary Design, Economic & Financial Analysis for the two BRT Lines.
Contact Us
We're not around right now. But you can send us an email and we'll get back to you, asap.