Assignment Name:
Prefeasibility Study of BRT  “Brown” &”Yellow” lines with Implementation Program and Organizational Structure
Country:

Pakistan

Location within Country:

Karachi

Name of Client:

Karachi Mass Transit Cell (KMTC), Government Of Sindh

Completion Date:

January 2013

Name of Associated Consultants, if any:

None

Narrative Description of Project:

Primary Disciplines:
  • Mass Transit, BRT/MRT Planning & Preliminary Design
  • Mass Transit, Transportation Planning
  • ITS System Planning & Design
  • Mass Transit, BRT/MRT Operational Planning
  • Mass Transit, Fleet Size Determination & BRT Bus Selection

This study includes BRT transportation and traffic planning and preliminary stage design and estimation of geometrics, traffic management, ridership assessment, ITS & fare collection system, stations planning, operational and fleet management plans etc. This study provided a quick guide for the investors to invest on the two BRT lines ‘Brown’ & ‘Yellow’. These corridors are on the highest priority list of Karachi Mass Transit Cell (KMTC) to be implemented in Karachi in order to initiate mass transit system. This report will also guide in the feasibility stage of the project and for the detailed design of the alignment. BRT Blue Line is the longest BRT Line in Pakistan (54 km); BRT Yellow Line is 26.5-kilometre-long.

Description of Actual Services Provided by Our Staff within the Assignment:

Exponent Engineer has provided complete Traffic, Preliminary Design, Economic & Financial Analysis for the two BRT Lines.

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search