Assignment Name:
Preparation of Unsolicited Proposal under Public Private Partnership (PPP) for BRT Services in Hyderabad, Pakistan
Country:

Pakistan

Location within Country:

Hyderabad

Name of Client:

  • Kainat Enterprises (Project Sponsor)
  • PPP Unit, Government of Sindh
  • Completion Date:

    On-going

    Name of Associated Consultants, if any:

    None

    Narrative Description of Project:

    Hyderabad is the second largest city of Sindh province. The city has a population of about 1.7 million, however the public transport service & allied infrastructure is rudimentary. The City is characterized by narrow road widths primarily because of temporary encroachment. The project is likely to proceed on Public Private Partnership (PPP) model through an investor. An unsolicited proposal was provided to Government of Sindh for consideration of financial and technical features for subsequent approval. . The project involves developing a World Class 3rd Generation System for Hyderabad. A total of 12 km dedicated infrastructure with 13 Stops. The System covers a length of about 70 km through 6 off corridors routes and 2 feeder services, thus giving a city-wide coverage. The system will have a mixed fleet of 12m and 8.5m fully electric vehicles and would serve an expected demand of about 100,00 passengers daily.

    Description of Actual Services Provided by Our Staff within the Assignment:

    BRT layout, Conceptual Design & Detailed Engineering Design:
    • 12 km of dedicated BRT Corridor Network Design
    • 13 Dedicated independent docking bus stations
    • Improvement of more than 70 km road improvements works
    • Improvements of Walkways
    • Development of BOQs & Cost Estimates
    Operational Planning:
    • Traffic research
    • Transportation demand modelling
    • Service Planning
    • Fleet sizing
    • Defining KPIs for Various Aspects of Operations
    EV Requirement Assessment:
    • Assessment of Power for Charging Infrastructure
    • Negotiating with Local Power Supplier for SLA
    • Negotiating with electric Fleet Providers
    Fleet and system acquisition plan:
    • Functional requirements
    • Technical Specifications of EV
    • Traffic Management Center
    • Traffic Signaling
    • Electric Charging System
    Assistance in Financial Modelling & Concession Agreement Drafting:
    • Providing Requisite Assumptions for Developing a Financial Model
    • Assisting Financial Team in Determining PP Transaction Structure
    • Assistance to Legal team in Drafting of Draft Concession Agreement
    • Assisting in Concession Negotiations

    Contact Us

    We're not around right now. But you can send us an email and we'll get back to you, asap.

    Start typing and press Enter to search