Assignment Name:
Traffic Circulation Improvement study after introduction of BRT System in CBD Area Karachi
Country:

Pakistan

Location within Country:

Karachi.

Name of Client:

part of Red Line BRT ODBM Package under ADB Contract

Completion Date:

September/2018

Name of Associated Consultants, if any:

None

Narrative Description of Project:

  • Analysis of Existing Traffic Conditions
  • Analysis of Predicted traffic conditions after 5 years
  • Analysis of Traffic conditions after the introduction of the BRT System

Description of Actual Services Provided by Our Staff within the Assignment:

  • Detailed study of on field conditions i.e. road widths, No. of lanes, existing signal timings, Encroachments, on street parking etc.
  • Detailed Traffic Volume Counts on all Junctions of M.A. Jinnah Road, Prince Road and Nishtar Road.
  • Development of microsimulation model on PTV VISSIM of Existing Conditions i.e. Base Case.
  • Calibration of Base Case Model.
  • Microsimulation Analysis of Predicted traffic conditions without introduction of the BRT System.
  • Microsimulation Analysis of Predicted traffic conditions with introduction of the BRT System.
  • Propose Mitigation measures to improve the system.
  • Provide essential recommendations in order to run smooth BRT and mix traffic operations in the area.

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search