Assignment Name:
Traffic Impact & Management Study for Dolmen City, Karachi
Country:

Pakistan

Location within Country:

Karachi.

Name of Client:

Dolmen Group

Completion Date:

December 2015

Name of Associated Consultants, if any:

None

Narrative Description of Project:

  • Review of Available Plans, Studies & Existing Conditions
  • Analysis of Present Situations
  • Propose Mitigation and Remedies

Description of Actual Services Provided by Our Staff within the Assignment:

  • Detailed study of Traffic Circulation and Parking at Basement Parking Floors of the Mall
  • Detailed study of Traffic Circulation around Mall Entrances and Drop Off Points
  • Collection of Traffic data (like Volume, Drop Off Timings, Speed etc.)
  • Calculation of Queue Lengths and Delays at Drop Off Points and Entrances of Mall
  • Re checking of Validation of Traffic Circulation in Isles and Circulars
  • Re checking of Validation of all Parking Stalls with respect to Proper Traffic Circulation
  • Proposed measures to reduce queues at Drop Off Points and Entrances
  • Proposed measures for better circulation in isles and circulars
  • Remove parking stalls which are not accurate according to the standards

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Start typing and press Enter to search